Door frame procedure door method metal doors installation post navigation method statement for aluminum glazing cladding works accessories safe work method statement for premix plastering work.
Fire rated door installation method statement.
This method statement refers to various work procedures which explains and covers the installation of hvac supply return exhaust ducts dampers fire damper and access doors.
Frames are 1 4mm thick and 100mm x 100mm x nom.
If you install a fire door incorrectly there are 4 main risks.
Mini fire doors.
Signage correct fire door signage should be fitted on all non domestic fire doors at eye level.
Maxi fire doors.
Civil method statements tags.
Non fire rated semi solid core wood door.
Fire sound method statement f s ms04.
Wood door installation method of statement includes the following.
Hinges a minimum of 3 fire rated hinges must be used with correct intumescent pads location and fixings.
All frames to be backfilled as required.
In some instances additional hinges will be required for particularly large or wide fire doors and you should always consult the.
Ensure all spaces are filled with insulation material.
This swms covers high risk construction work hrcw controls related to.
Wood veneer solid hardwood raised panels and stained varnish materials for application.
Mini fire doors.
This method statement covers work for the project.
General description the primary reason for generating this method statement is to explain the installation process of non fire rated insulated roller shutter door as a specified requirement sp section 0000 and as illustrated in standard related drawings.
Installation as per approved method statement and material.
For fire rated installations the studs should be cut 15mm short of the full height to allow expansion in the event of a fire alternative head assembly details can be formed using tf202 galvanised steel track and a choice of offset cover trims.
1 the fire door will not perform in the event of a fire causing fire and smoke spread through the building creating danger to the occupants and firefighters.
Title the installation method of non fire rated insulated roller shutter door 2.
Non fire rated semi slid core custom fabricated wood door access doors.
Ensure that all recessed panels electrical outlets light switch boxes etc are encased with fire barrier seal wrap to seal all gaps and maintain continuity in fire and smoke protection in all fire rated assemblies.
This fire door installation safe work method statement swms covers hazards and controls associated with the general aspects of fire door installation in residential and commercial buildings.
Scope of work 2 1.
2 5mm thick heavy duty hinges to be used.
Mobile plant movement pressurised.
Frames are 1 1mm thick and 100mm x 75mm x nom.