Mike kirby explains some of the key items you need to carry and maintain to combat a high rise fire.
Fire fighting equipment for high rise building.
Fire fighting techniques.
Rule 43 recommendations 28 march.
Serious fire in 15 storey block in margate kent invicta house 2 july 2013 hampshire fire and rescue service.
Some very small or specialised incidents may be extinguished using fire extinguishers dry powder or co2.
Vertical pipeline for overhead tank.
Fighting fires in high rise buildings.
In a high rise fire we face a uniquely difficult set of challenges in fighting the fire communications rescuing occupants and fire spread.
The drone has more than enough power to go up to the fire location.
If you re not using the proper hoseline or the proper nozzle your water supply may not make it to the fire floor and that could lead to disaster.
In preparing for a high rise or mid rise building fire potentially a once in a career type of event the training should be 90 hands on and 10 guideline review.
A high rise load bag is basically a bag designed to help fire fighters move equipment through a high rise building.
In high rise fire incidents it s extremely important to have the right tools at the ready.
In high rise buildings elevators are an essential component of moving firefighters and equipment to upper floors.
Almost all fire fighting tactic in high rise buildings will depend on water.
A vertical pipe connected to the water tank built underground.
In mid rise buildings i do not recommend using the elevator for the attack team.
On a cold winter evening for a fire on the third floor of a 23 story residential high rise.
There are two key contributory factors that will affect tactics at high rise buildings a supply pressure at fire floor.
To effectively evacuate a high rise building.
It was piled up in lifts lobbies and stairwells.
Fatal fire investigation shirley towers 2010 pdf hosted by hantsfire gov uk.
Historically equipment was carried by hand under arm or tucked into tunics.
The building is type 1 fire resistive construction with more than 300.
An alarm comes in at 5 p m.
Tools and equipment for other structural responses.